Solar roofs & storage

Waterproof the roof before the array goes up.

Plan roof maintenance before installing a long-lived solar array. We explain where compatible roof and containment coatings may fit, what needs manufacturer-specific approval, and how to discuss a project with ArmorThane applicators.

ArmorThaneTalk to an applicator

Send roof size, deck type and array plans to ArmorThane for a coating quote.

Why coat first

A solar roof is a long commitment.

Review the whole roof system

A liquid-applied membrane may provide a continuous surface, but joints, penetrations, drainage and existing roof condition still need compatible details and inspection.

Coordinate every roof detail

Roof penetrations and mounts need details approved for the roof and mounting system. A coating does not replace required flashing, attachment hardware or manufacturer instructions.

Removal is expensive

Roof work can require array removal and recommissioning. Assess repair, restoration or replacement before installation, and document responsibility for future removal costs.

Roof readiness

Confirm the roof is ready for the panels.

Before rails are laid out, assess roof condition and remaining service life. Any coating proposal needs compatibility, preparation, moisture and adhesion checks for the exact roof system, plus manufacturer and warranty acceptance. No single coating suits every roof.

Plan your roof coating

Battery rooms too

Where electrolyte containment is required, select the lining for the actual battery chemistry and exposure. It does not replace ventilation, electrical, fire-safety or equipment-clearance requirements.

What we cover

Coating jobs around a solar system.

ContinuityCheck joints and details
Cure timeFollow product instructions
ReflectanceReview tested product data
MovementVerify system compatibility
How it works

From bare roof to array-ready.

Inspect

Check moisture, drainage, loose seams and planned mount locations with the solar layout in hand.

Prepare

Follow the approved roof-system preparation and repair specification; investigate defects before covering them.

Spray

Apply only the specified compatible coating system, with approved details and quality checks. Keep PV equipment and required interfaces protected.

Hand off

Document inspection results, warranty conditions, maintenance access and roof-to-array responsibilities before installation.

Get a Roof & Solar-Prep Quote

Planning panels on an aging roof? Tell us about the building and an ArmorThane coating specialist will follow up.

Questions

Common questions.

How big a system do I need?

Start with 12 months of electricity use from your bills, then factor in roof space, orientation and shading. An installer will run a production model.

String inverter or microinverters?

String inverters are simpler and cheaper; microinverters handle partial shading better and monitor each panel. Shading and budget usually decide.

Do I need a battery?

Not to use solar. A battery adds backup power and can help with time-of-use rates, but it adds significant cost.

Should I fix my roof first?

If the roof is near the end of its life, yes. Removing and reinstalling panels later is expensive.

Can a flat commercial roof be coated before solar?

Many are. A properly applied roof coating can restore a sound roof before racking goes on; plan penetrations with the solar installer.

Where do I check incentives?

Check current federal, state and utility programs directly, because amounts and eligibility change.

Seal the roof. Then go solar.